The completed chain stay jig with a couple of raw stays installed. The rear dropouts are attached to the stays first. The drop outs are then clamped to the aprropriate width rear axle and the vee blocks are adjusted to suit the bottom bracket width. The entire assembly is then clamped in the vise on the milling machine and the stays are then cut to length and mitered in one operation using a hole saw that matches the diameter of the bottom bracket.
Viewed: 7077 times.
|
The axle block clamp with a rear axle installed.
Viewed: 2660 times.
|
The other side.
Viewed: 2436 times.
|
Axle clamp riser block.
Viewed: 2936 times.
|
The axle clamp installed on the riser block.
Viewed: 2407 times.
|
Vee block halves and tee nut
Viewed: 2513 times.
|
Top view of assembled vee block
Viewed: 2310 times.
|
Bottom view of assembled vee block.
Viewed: 2920 times.
|
Closeup of the bottom bracket end of the jig showing the tee slot and the center line.
Viewed: 2259 times.
|