Frame Jig 
Main Vertical Rail

1
Main Vertical Rail

1"x6" Aluminum
Viewed: 2677 times.

 Horizontal and Vertical Rails

Back view of the horizontal rail showing the lap joint.
Horizontal and Vertical Rails

Back view of the horizontal rail showing the lap joint.
Viewed: 2437 times.

Main Rails Assembled

The 1/2
Main Rails Assembled

The 1/2" countersunk cap screws lock the joint.
The bottom bracket post hole is centered on the back edge of the veritical rail to make measuring chain stay length easier.
Viewed: 2367 times.

Bottom Bracket Post and Collet Pieces

The tubing fitting on the right of the post is for argon purge
Bottom Bracket Post and Collet Pieces

The tubing fitting on the right of the post is for argon purge
Viewed: 2325 times.

Closeup of the Bottom Bracket Collet

When the bolt is tightened the tapered washers expand the collet and center the bottom bracket.
The washer is used to center 68mm BBs and is removed for 73mm BBs.
Closeup of the Bottom Bracket Collet

When the bolt is tightened the tapered washers expand the collet and center the bottom bracket.
The washer is used to center 68mm BBs and is removed for 73mm BBs.
Viewed: 2571 times.

Bottom Bracket Collet - View 2
Bottom Bracket Collet - View 2
Viewed: 2289 times.

Bottom Bracket Collet Assembled
Bottom Bracket Collet Assembled
Viewed: 2602 times.

BB Post and Seat Tube Rail
BB Post and Seat Tube Rail
Viewed: 2429 times.

BB Post and ST Rail Installed

The seat tube rail pivors on the bottom bracket.
BB Post and ST Rail Installed

The seat tube rail pivors on the bottom bracket.
Viewed: 2420 times.

Powered by Gallery v1 RSS